Clean room wall panels install quickly
Fan coil units and other mechanical
equipment are installed on the top deck,
saving floor space and weight on the building
structure.
Modular clean room walls
Modular walls and top deck panels form
the sealed clean room envelope.
Prefabricated top deck panels are
installed on the load bearing walls
Prefabricated wall panels install quickly,
with no on-site welding, sawing, or
finishing
The cleanroom ceiling and hepa filters are
installed below the deck, providing a leak
free return air plenum above the cleanroom
ceiling.
Clean room hepa filters installed below deck
Recirculation fan cabinets are installed on
the walkable top deck for easy maintenance.
Required mechanical systems, such as this
chilled water plant, are provided by KTEC
Cleanroom Systems.
Mechanical provided by KTEC Cleanroom Systems
Raised floor and flow thru lighting
provide full vertical laminar flow.
Clean room laminar flow
Cleanroom prefabricated panels
Entire contents Copyright © 2000, KTEC Cleanroom Systems, Round Rock, Texas. All rights reserved.
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
Copyright © 2000, KTEC Cleanroom Systems
KTEC provides true turnkey service,handling all aspects of the
cleanroom installation from shipping, material handling, sub-trades,
and start-up
.
Installation:
KTEC Cleanroom Systems  1300 W. Industrial Blvd., Suite 2  Round Rock, Texas 78681
PHONE: 512.388.2396  FAX: 512.388.2859