Company Name:*
|
|
|
|
|
|
|
|
Address:
|
|
|
|
|
|
|
|
|
|
Project Coordinator:*
|
|
|
|
|
|
|
|
|
|
|
|
City:
|
|
|
|
|
|
|
|
|
|
Phone:*
|
|
|
|
|
|
|
|
|
|
|
|
State/Province:
|
|
|
|
|
|
|
|
|
|
|
Fax Number:
|
|
|
|
|
|
|
|
Postal Code:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contact E-Mail:*
|
|
|
|
|
|
Country:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Personnel:
|
|
|
Date Proposal Required:
|
|
|
|
|
|
|
|
|
Desired Project Completion Date:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name:
|
|
|
|
|
|
GENERAL FACILITY DESIGN CRITERIA
|
|
|
Process to be performed in the cleanroom:
|
|
|
|
|
|
|
Cleanliness Class (Check one)
|
|
|
Class 10 ISO 4
|
|
|
|
|
|
|
|
Class 100 ISO 5
|
|
|
|
Class 1,000 ISO 6
|
|
|
|
Class 10,000 ISO 7
|
|
Class 100,000 ISO 8
|
|
Not Sure
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Comments:
|
|
|
|
|
|
Desired Room Conditions:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%
|
|
+/-
|
|
|
|
|
|
|
|
|
|
°F
|
|
°C
|
|
Temperature setpoint::
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
+/-
|
|
|
|
|
|
|
|
|
|
|
|
Relative Humidity setpoint:
|
|
|
|
|
|
|
|
|
%
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Comments:
|
|
|
|
|
|
|
|
|
|
|
|
Type of Equipment to be used in the cleanroom:
|
|
|
|
|
|
Process Heat Load:
|
|
|
The heat load generated by process equipment and dissipated to the room (KW or BTU/hr) can be estimated based on the total power consupmption of the process equipment.
|
|
|
|
|
|
|
|
|
|
Any open tanks or other source of high moisture load to the room
|
|
|
|
|
|
|
People Load:
|
|
|
|
|
|
|
|
Average number of people working in the rooms:
|
|
|
|
|
|
Expected operating shifts per day:
|
|
|
|
|
|
|
|
|
Process exhaust affects the type and size of the HVAC equipment requied for the room. In addition, fume exhaust may require apecial treatment to comply with air pollution codes. Pleane specify the type and quntity of any hazardous or toxic liquids or gasses used in the room.
|
|
|
|
|
|
Hazardous Materials:
|
|
|
|
|
|
Static Control:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Yes
|
|
|
No
|
|
Conductive Flooring Required?
|
|
|
Yes
|
|
|
|
|
|
|
|
|
|
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
Process or materials are ESD sensitive?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Special Considerations:
|
|
|
|
|
Special lighting, pressure relationships, air flows, etc.
|
|
|
|
CLEANROOM DESIGN DETAILS
|
|
|
|
|
|
|
|
Desired Room Size: (Or attach plan)
|
|
|
|
|
|
Ceiling Height:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ceiling Height:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ceiling Height:
|
|
|
|
|
|
|
|
|
|
|
|
Material Passthru Size:
|
|
|
|
|
|
|
|
|
Interlocked:
|
|
|
|
|
|
|
|
Yes
|
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interlocked Doors:
|
|
|
|
Automatic Doors:
|
|
|
Yes
|
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
Yes
|
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air Shower:
|
|
|
|
Air Ionization:
|
|
|
|
|
|
|
|
|
|
No
|
|
|
|
|
|
|
Yes
|
|
|
|
|
|
Yes
|
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Utilities:
|
|
|
|
|
|
|
120V convenience outlets spaced every
|
|
|
feet along walls.
|
|
|
|
|
|
|
|
Other electrical outlets:
|
|
|
|
|
|
|
|
|
|
Intercom System:
|
|
|
|
|
|
Compressed Air, Nitrogen, Argon, Vacuum, DI Water. etc.
|
|
|
|
|
|
|
|
Central Vacuum Cleaning System:
|
|
|
|
|
|
|
|
|
Room Monitoring Instrumentations:
|
|
|
|
|
Full building automation system with PC graphics control and trending
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Room static pressure gages
|
|
|
Digital Temp/Humidity Displays
|
|
|
|
|
|
|
|
|
|
|
|
|
PC interface for temperature, humidity, static pressure downloads
|
|
|
|
|
|
|
|
Comments:
|
|
|
|
|
|
SITE INFORMATION
|
|
|
|
|
|
|
|
|
|
Building Data:
|
|
|
|
|
|
Existing Building:
|
|
|
New Construction:
|
|
|
|
|
|
|
|
|
|
|
|
|
floor of a
|
|
|
|
|
|
|
|
story building.
|
|
Cleanroom to be installed on the
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Clear height from floor to bottom of joists?
|
|
|
|
|
Demolition required to make way for cleanroom?
|
|
|
|
|
|
|
|
|
|
|
No
|
|
|
|
|
|
Yes
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Approximate height of building roof?
|
|
|
|
|
|
|
Does the building have fire sprinklers?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Yes
|
|
No
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Height of interferences remaining below joists?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air-Conditioned around cleanroom area?
|
|
|
|
No
|
|
|
|
|
|
Yes
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Distance of cleanroom from outside building wall?
|